CONSTRUCTION NOTICE
At malee highlands
We’ve planned ongoing construction periods, with daily work typically from 8 am to 5 pm.
PERIOD 1
April 1 To December 15, 2026
Construction will take place on adjoining land near Malee Highlands. Normal working hours 8 am -5 pm everyday.
Some days the work will be later than 5pm depending of the work that cant be stopped like casting concrete.
Impacted buildings:
• E & F – Construction will take place in front of these houses
G – A new pool area and two bungalows will be built here
• H – A new pool area and two bungalows will be built here
• I – Limited traffic may occur
No construction directly in front of the buildings below.
• A, B, C & D – Not affected
HIGH-SEASON
December 15, 2026 – March 1, 2027
During this period, only non-disruptive indoor work will be performed.
No noisy construction work from big maschines will take place,
and the main area will not be disturbed.
PERIOD 2
March 1 – December 15, 2027
Construction will take place on adjoining land near Malee Highlands. Normal working hours 8 am -5 pm everyday.
Some days the work will be later than 5pm depending of the work that cant be stopped like casting concrete.
Impacted buildings:
• E & F – Construction will take place in front of these houses
• G – A new pool area and two bungalows will be built here
• H – A new pool area and two bungalows will be built here
• I – Limited traffic may occur
No construction directly in front of the buildings below.
• A, B, C & D – Not Affected
Thank you for your understanding
Malee Highlands